Structure of auto control arms Corolla Control Arm,Lower Control Arm Ford Focus,Left Suspension Control Arm,Control Arm Suspension Lift Saga Auto Parts Co., Ltd. , https://www.sagatd.com
Following information is essential for your better understanding on our moulds
Name Description
Products' info we need to make quotationClear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKD61 etc
Mould Base LKM, HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould Design3D/2D Drawing
Design Days 3 days
Design Software UG, PROE, CAD, CAE, CAM, CAXA ect
Plastic MaterialPP, PC, PS, PE, PU, PVC, ABS, PMMA ect
Mould Life 300, 000-3, 000, 000 shots
Injection SystemPin-point-gate
Polish SystemMirror Polish
Payment40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time 15-60days
Specification Depends on customers requirements
Business Step
1. R& D
We support customer R& D. Make the files or improve the design if you needed
↓ ↓ ↓
2. Quotation Making
Mould Quotation will be finished in 1 day according to information we get
↓ ↓ ↓
3. Negotiation
The quality, price, material, delivery time. payment item. ect
↓ ↓ ↓
4. Mould Design
3-5 days for mould and product 3D/2D drawing design
↓ ↓ ↓
5. Mould
According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days
↓ ↓ ↓
6. Mould Testing
When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.
↓ ↓ ↓
7. Sample shoot
If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory
 ↓ ↓ ↓
8. Delivery
Delivery goods by sea or by air, according customers requirement
1. Stabilizer bar link
During the suspension installation, one end of the stabilizer bar link is connected with the lateral stabilizer bar through the rubber bushing, and the other end is connected with the control arm or bucket shock absorber through the rubber bushing or ball hinge. The lateral stabilizer bar link is used symmetrically in the home selection, which can improve the operation stability.
2. Tie rod
When the suspension is installed, the rubber bushing at one end of the tie rod is connected with the frame or body, and the rubber bushing at the other end is connected with the wheel hub. This kind of control arm is mostly used in multi link suspension and tie rod of steering system, which mainly bears lateral load and guides wheel movement.
3. Longitudinal link
The longitudinal link is mostly used for drag suspension to transfer traction and braking force.
4. Single control arm
This kind of vehicle control arm is mostly used in multi link suspension, and two single control arms can transfer the lateral and longitudinal loads from the wheels.
5. Fork (V) arm
This kind of vehicle control arm is mostly used in the upper and lower arms of double wishbone independent suspension and the lower arm of McPherson suspension. The fork structure of the arm body mainly transfers the transverse load.
6. Triangular arm
This kind of vehicle control arm is mostly used in the lower arm of the front suspension McPherson suspension, which is used to transfer the transverse and longitudinal load and control the relative movement of the wheel and the body.
Model NO.: RMMOULD71201
Design Software: UG
Installation: Fixed
Standard: HASCO
Customized: Customized
Name: Water Purifier Mould
Cavity: Single/Hot Mould
Polish: Mirror Polish
Payment: T/T
Mould Base: 45#/P20/Lkm/Hasco
Steel: P20/718/2316 etc.
Gate: Big Gate/Pin-Point Gate/Sub Gate etc.
Design: 2D/3D
Trademark: REMO
Transport Package: Wooden Case
Specification: International
Origin: Taizhou China
HS Code: 8480719090
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.