East China University of Science and Technology has such a group of "doctors" of industrial installations. They have achieved a brilliant record in coping with the creep, a chronic illness called the "cancer" of equipment. After more than 10 years of research and development, they have completed a set of high-temperature process equipment structural integrity evaluation technology system, and achieved three key technological innovations: high-temperature creep design, safety evaluation, and damage monitoring and early warning. In the past three years, they have been in petrochemical, power, After 100 units (sets) of equipment in the metallurgical and other industries were added, direct and indirect economic benefits were increased by 2.5 billion yuan. The research group headed by Prof. Tu Shandong won the 2013 National Second Prize for Scientific and Technological Progress for his outstanding achievements in the key technologies and application research and development of high temperature process equipment structural integrity.

Boiler Pressure Parts

Steam EconomizerThe main pressure parts in a boiler will be as follows:Drums, Water walls, Super heaters, Re heaters, Economisers and valves & fittings. The Drum, Down comers, water wall headers and water walls will form the circulation system and cover the furnace zone.

Boiler Superheater Tube,Boiler Water Distributor,Boiler Membrane Water Wall,Boiler Water Collector

Jinan Yuanda Power Equipment Co.,Ltd. , https://www.jnyuandaboilers.com