Generally there are three ways

1. Each level is set to directly drain the pump house. This type of drainage requires an independent circuit for each water level. There are many pipes in the wellbore, and the management and maintenance are complicated. The advantage is that they do not interfere with each other. Each stage has an independent drainage system, as shown in Figure 1(a).

Figure 1 Schematic diagram of the drainage system

2. When the lower water inflow is small and the upper water inflow is large, the lower water is discharged to the upper level, and then the upper horizontal main pump room is concentrated to the surface, as shown in Figure 1(b).

3. When the lower part of the water is large and the upper part of the water is small, the upper part of the water can be placed at the lower level and concentrated by the pump to the surface. The drainage system is simple, the capital construction cost is low, the pipeline is laid simply, and the management cost is low. In this way the metal mine drainage use more, if possible, when disposed sudden gushing mine, the main pump should not be located at the lowest level, see Figure 1 (c) shown in FIG.

Peach Shape Post

Peach Shape Post,Peach Shaped Post,Peach Shape Post And Beam,Peach Post

ANPING COUNTY HUAXING WIRE MESH CO.,LTD , https://www.huaxingwire.com